download schede

Installation guide

INSTALLATION

INSTALLATION

 

Install the control unit in the specific case, first releasing it from the top brackets and then from the bottom ones

PRIMARY CIRCUIT CONNECTION

PRIMARY CIRCUIT CONNECTION

 

Connection of entry/return flow primary circuits from heat generator

SECONDARY CIRCUIT CONNECTION

SECONDARY CIRCUIT CONNECTION

 

 

Connection and tightening of entry/ return flow secondary circuit from high temperature and low temperature system

 

FILLING THE SYSTEM - STEP 1

FILLING THE SYSTEM - STEP 1

 

Close the entry/return valves of the primary circuit (red and blue); open manually the first thermostatic shutter and turn the specific knob anticlockwise 

 

FILLING THE SYSTEM - STEP 2

FILLING THE SYSTEM - STEP 2

 

Close the following shutters by turning the specific knobs clockwise 

 

FILLING THE SYSTEM - STEP 3

FILLING THE SYSTEM - STEP 3

 

Open the first lockshield by turning the Allen wrench anticlockwise 

 

FILLING THE SYSTEM - STEP 4

FILLING THE SYSTEM - STEP 4

 

Close the following lockshields by turning the Allen wrench clockwise.
Filling steps must be repeated for as many TRITONE configuration chosen connections. 

 

HYDRAULIC CONNECTION

HYDRAULIC CONNECTION

 
Hydraulic connection 

 

ELECTIRCAL CONNECTION

ELECTIRCAL CONNECTION

 

Electrical connection

 

TEMPERATURE ADJUSTMENT

TEMPERATURE ADJUSTMENT

 

Liquid temperature adjustment of secondary circuits with 11 mm spanner. 

 

If you have any doubts or questions about TRITONE, please do not hesitate to contact us via live chat